Work is now complete on the drainage and retaining wall, No more damp at the back of the house.
The plan now is to build a rock garden on the other side of the wall and cover the brickwork with a ton of flowers. It will look good next year.
Also the plumber turned up to start work. The water heater that was outside has now been disconnected and a new one put in under the stairs.
I would have taken a picture of the old boiler, but she was out shopping!!!!!
No comments:
Post a Comment